Industrial Floor Treatments (Stone) Ltd is a dedicated factory floor painting contractor based in Staffordshire, midway between Manchester and Birmingham. Most of our floor painting contracts are in and around Northampton, Coventry, Birmingham, Stoke, Derby, Manchester, Liverpool, Leicester, Nottingham, Leeds and Sheffield, though we offer our services further afield.
Industrial Floor Treatments (Stone) Ltd apply epoxy resin factory floor paint on small, medium and large factory floors including new build, dilapidation and refurbishment projects. Most of our factory floor painting contracts are in the manufacturing, assembly, automotive, and engineering industries.
Industrial Floor Treatments (Stone) Ltd apply epoxy resin factory floor paint on small, medium and large factory floors including new build, dilapidation and refurbishment projects. Most of our factory floor painting contracts are in the manufacturing, assembly, automotive, and engineering industries.
Services
Industrial Floor Treatments (Stone) Ltd is a dedicated factory floor painting contractor based in Staffordshire, midway between Manchester and Birmingham. The majority of our dilapidations floor painting works are in and around Northampton, Coventry, Birmingham, Stoke, Derby, Manchester, Liverpool, Leicester, Nottingham and Sheffield though we do offer our services further afield.
Industrial Floor Treatments (Stone) Ltd are a dedicated factory floor painting contractor based in the Midlands. We apply epoxy resin factory floor paint on small, medium and large factory floors including new build and refurbishment projects. Please note that we do not undertake domestic works, concentrating solely on industrial premises.
Commercial laundries have changed enormously over the last few years with many having been transformed from top to bottom into state of the art workplaces. These changes reflect a demanding customer base that ranges from corporate work-wear, hotel and restaurant linens through to sterile wear for hospitals and clean rooms.
Plant room floor painting can waterproof your floor and protect rooms and equipment below. It also protects the plant itself from airborne dust generating from the floor. Plant room floors may be subjected to water spillages that can leak through to the rooms below via cracks, bolt holes and service protrusions in the floor.
Many HGV Workshops operate seven days a week and some twenty-four hours per day which means that the opportunities to maintain and upgrade the floor finishes are limited by time constraints. This puts the floor area out of commission for a minimum of 3-4 days plus curing time of at least one full day in the summer and two to three days in the winter months.