Steel Decking Supply by SWUK | Our aim is to take the hassle out of any requirement you have for metal flooring, whether you are an existing or new client. Each enquiry, tender and order is treated the same way with attention to detail and service second to none. Install only of Steel Decking, Metal Decking, Edge Trim and Shear Studs - fully trained and qualified.
Composite Flooring, Concrete Flooring, Structural Roof Decks, Fall Arrest Systems, Machine Hire, and more. SWUK Steel Decking has over 30 years experience dealing with construction companies installing composite steel floor decks. We are a Midlands based, family run business which originally started out as a installation only, steel decking and shear stud welding company.
Composite Flooring, Concrete Flooring, Structural Roof Decks, Fall Arrest Systems, Machine Hire, and more. SWUK Steel Decking has over 30 years experience dealing with construction companies installing composite steel floor decks. We are a Midlands based, family run business which originally started out as a installation only, steel decking and shear stud welding company.
Services
We supply a range of market leading profiles, created with over 30 years experience in the composite metal flooring market. The three profiles; Metfloor 55, Metfloor 60 & Metfloor 80, are manufactured on dedicated lines designed to enhance production lead times. Production is carried out at a purpose built facility and we are proud to offer one of the quickest turnarounds in the industry from order placed to delivery.
Our supply only service is second to none, offering a full range of steel decking and associated products from stock. This can be collected either on the same day from our strategically based Midlands stockyard or delivered next day across the UK. Offering the popular Metfloor range of products, we are able to provide equivalents to the often specified RLSD products such as the Holorib and Ribdeck E60; outperforming them in the majority of cases.
SWUK Steel decking has the fastest turnaround within the industry when it comes to supply and installation packages. Specializing in projects up to 500m2, SWUK Steel Decking are able to achieve lead times of up to 2 weeks for the supply and installation of steel decking without compromising quality.
SWUK Steel Decking's directly employed, directly managed site operatives are the key to project success. Our operatives are fully trained and all hold the appropriate Health & Safety qualifications such as CSCS, FASET, IPAF & SSSTS. All of our metal deck projects are managed by a dedicated contracts manager from SWUK, ensuring full control of the installation program of a project.
The right roof deck product will typically depend on the structural support type, support spacing and loadings applied. With a comprehensive product range from 30-200mm high, SMD has the product to suit your roof specification. The SMD structural roof deck product range provides options for all support types from light gauge steel purlin to hot-rolled sections.
Reviews (1)
Cam Galli
Jul 02, 2020
Report