Chesterfield Skip Hire
Call now
Call now
Website
Call
Chesterfield Skip Hire
If you are in or operate in Central and North Derbyshire, Sheffield, Central and North Nottinghamshire or South Yorkshire we are the waste management company for you. We operate a modern fleet of vehicles all of which are GPS controlled, have lots of skips for all types of jobs - commercial or domestic - and ALL of your waste will be processed on our thirty acre site.

We also supply recycled materials from our waste processing operation together with original MOT type 1 and gritsand etc. Press the "other materials" button for more information. Why not get a quote now - press here to go to our contact page - we are waiting to serve you.
Services
Formed in 1986 to recover ferrous metals from a local steelwork's tailings the company has grown into one of the largest privately owned waste management companies in the area. We provide a skip and recycling service to an area in radius of 25 miles from our base in Staveley, Derbyshire. This covers North and Central Derbyshire, North West and Central Nottinghamshire, Sheffield and parts of South Yorkshire.
We are fully licenced and operate a modern fleet of eight skip vehicles all of which are controlled with up to date mobile communication facilities and G P S positioning. Our skip stock is in the hundreds ranging in size from 3 cu yds to 40 cu yds roll on roll off. Both the commercial and domestic markets are covered and we believe our service is second to none.
The company was founded upon recycling back in the 1980's when perhaps it wasn't as fashionable as today. Over the years we have developed our thirty acre site and can now claim that all materials collected by us or brought to site by commercial customers are subjected to our recycling process. We have invested in the plant necessary to deal with solid waste from various sources.
On our thirty acre site here at Slittingmill we have the capacity to receive, store and reprocess various types of your waste from small skip loads to bulk receipts of inert waste. Our investment in modern mobile and static plant ensures that our recycling/recovery rates form all waste received on site is as high as possible and processed in the most efficient way possible.
Over the last few years we have developed an electricity generation power pack. Using reclaimed waste wood which feeds a 2000 litre boiler this pioneering plant can generated up to a maximum of 400kw of power at present. The process has full local authority planning consent, Environment Agency approval and inbuilt scope for further development.
Reviews (1)
Louise Clayton
Louise Clayton
Jun 25, 2020
Report
Positive: Punctuality, Value
Came and took skip back in error but returned another one the next day.